Food

From coffee and chocolate, to French fries and carbonated beverages... Our clients include
both enormous concerns as well as smaller family enterprises. We have been running businesses
in the food industry for years and the scope of work covers all stages of execution. From design
to the commissioning of machines. We have created plants for chewing gum, chocolate, coffee,
beverage, food fragrances, chips and many other factories.

SEDALCOL Distiller in Selby, U.K

 
5 fermentation tanks, 1290m3 each
2 storage tanks, 1090m3 each
2 yeast's fermentation tanks, 588m3 each


WESERGOLD Beverages Production Plant, Dodow Germany

 
Manufacturing and assembling of 8 tanks, 1500m3 each

Processing of Fruit and Vegetables Plant, Mogielnica

Manufacturing and assembling of 6 tanks, 1000m3 each

FRITO LAY Sp. z o.o., Grodzisk Mazowiecki, Tomaszów Mazowiecki

Assembly of process installation, extension of the existing plant (July 2008 - August 2009)

McCAIN Poland Sp. z o.o., Chociwel

Extension of potato processing plant in Chociwel (June 2008 - April 2009)

UNILEVER Polska S.A., Poznań

Execution of the complete technical installations for a new soup plant ordered by JACOBS Belgie N.V. (2006 - 2007)

LORENZ BAHLSEN SNACK WORLD Sp. z o.o. - Oława

Disassembly, replacing and reassembly of the technical installations to the new plant ordered by LSMW Sp. z o.o. (2005/2007).

NUTRICIA Laboratory Sp. z o.o. - Opole

Delivery and assembly of the complete cooling (glycol) installation together with the heat recovery installation (2005 - 2006)

LESAFFRE BIO-CORPORATION SP. Z O.O. - Wolczyn, Poland

Assembly and welding of a complete stainless steel technological installation for yeast production (2002)
Assembly and welding of a complete stainless steel technological installation for molasses, tun and packing room sterilization (2004)
Piping erection, delivery and assembly of the insulation for the wort densification installation (2005)










CADBURY WEDEL Sp. z o.o. - Warsaw

Replacing of the halvah line and sesame candy line from "Leaf Poland" in Warsaw to Cadbury Wedel in Warsaw (2006 - 2007)

CADBURY EGYPT GROUP FOR FOOD INDUSTRIES CO. - Egypt

Execution and delivery of a cooker (2005)

CERESTAR - A CARGILL Company - Manchester, UK

Delivery of the 18 vertical hydrocyclone housing (2006).

CARGILL (POLAND) SP. Z O.O. - Wroclaw, Poland

Assembly of new SMB installations and evaporator,
Execution and assembly of 10 fermentation tanks of a capacity of 226 m3,
Execution, delivery and assembly of a spent wash storage tank V=500m3 together with insulation and heat installation
Assembly of technical installations: pipelines (steel 316L); HDPE; assembly of devices, pumps and vessels.

CARGILL (Russia) Inc. - Efremov, Russia

Execution and delivery of a set of 18 hydrocyclons (2004).

ZBYSZKO Company Sp. z o.o. - Radom

Tank and piping erection commissionned by WILD&INDAG GmbH (2005)

CADBURY WEDEL Sp. z o.o. - Bielany Wrocławskie, Poland

Whiskey project - design, manufacture, supply, installation and start up of mechanical and electrical installation of liquid chocolate transportation for MiniEggs (January – June 2009)

Assembly of a complete installation to produce filled chocolate, including the design of the installation (mechanical and electrical parts, AKP - 3D drawing)

Cadbury Polska Sp. z o.o. - Skarbimierz near/Brzeg

Project O’Hara – modernisation and expansion of the process lines in the chewing gum Cadbury Polska factory in Skarbimierz - mechanical and electrical installation of equipment, design and supply of pipework, tanks and platform (August 2008 – January 2009)

Echo projekt - design, manufacture, supply, installation and start up of:

- low temperature hot water exchangers installation (LTHW) together with piping and fittings

- supports structures for LTHW piping and process piping

- access platforms to storage tanks

- process utilities installation.

Unloading and installation of process equipment